Skip to content
Feedstock Projects

Projects

Feedstock Programs Built Around Real Constraints

Every project starts with the same question: what tonnage is realistically available, and how do we deliver it reliably?

Project Types

The Kind of Programs We Run

Gujarat Sugar Belt

Press mud aggregation for a mid-sized CBG plant sourcing from three sugar mills.

Dairy Cluster Network

Cow dung supply chain built across a dense dairy-farming region.

Multi-Feedstock Program

Combined dung, press mud and biomass sourcing for a plant needing blend flexibility.

Case Study 01

Gujarat Sugar Belt Feedstock Program

Challenge

A CBG plant operator needed press mud volume that matched crushing-season peaks without gaps in the off-season.

Approach

We mapped three sugar mills within economic transport radius and structured seasonal aggregation agreements with staggered storage.

Execution

Set up dedicated collection points at each mill, established weighing protocols, and built a delivery schedule aligned to plant intake capacity.

Result

Consistent press mud supply through peak season with a managed off-season buffer, reducing feedstock-related downtime.

Case Study 02

Dairy Cluster Cow Dung Network

Challenge

A plant in a dairy-dense region lacked a structured way to aggregate dung from dozens of small and mid-sized farms.

Approach

We built direct relationships with gaushalas and dairy farms, consolidating volume through local collection points.

Execution

Rolled out scheduled pickup routes and grading checkpoints, formalising what had previously been ad-hoc collection.

Result

A predictable daily cow dung stream that plant operations could plan digester loading around.

Case Study 03

Multi-Feedstock Blend Program

Challenge

A newer CBG plant wanted flexibility to blend feedstocks based on seasonal availability and cost.

Approach

We designed a sourcing mix across cow dung, press mud and agricultural biomass, sized to the plant's blend ratios.

Execution

Coordinated multiple supplier streams with a unified delivery schedule, avoiding conflicting pickup windows.

Result

A flexible feedstock base that let the plant adjust its blend without renegotiating supply from scratch.

Have a project in mind?

Tell us about your plant or waste stream and we'll scope it together.

Start a Project Conversation

Get In Touch

Tell Us About Your Project

Please enter your name.
Please enter your company name.
Please enter a valid phone number.
Please enter a valid email address.
Please enter your location.
Please select a requirement type.
Please add a short message.